Eddy – 1 level vertical extension – Brussels

Year:
2017

Building:
this is a typical three storey building from the 40’s

Scope:
the owner wants to investigate whether they can increase annual rental yield by adding a new apartment on the 3rd floor. This would lead to a better energy-performing building thanks to the new rooftop with reduced charges for the tenants and eventual increase of rental yield for the owner

Project:
the new entity will be built in CLT and covered with a mix of Zinc and Trespa panels in rust tint giving it an eye-catching appearance

Status of the project:
in study phase

Drawings and visualization ©Valentina Carrara Architects

 

©2020 All rights reserved to Sid Studio Architects sc • Web design: MOOD-D